Always
use laundered rayon-blend mop heads for waxing.
Soiled or new cotton mops can turn the finish
brown. Before use, soak mops in water and wring
out tightly, so they absorb less finish and
are easier to clean.
Coat
traffic lanes more than other areas. On the
first application, stay at least 12 to 14 inches
away from baseboards and corners. Gradually
work closer to the edges with each subsequent
coat. To prevent edge buildup, apply one coat
to non-trafficked edges for every three coats
applied in traffic lanes.
Apply
finish in uniform, medium to full coats. Thin
coats may dry faster, but often strength and
contribute to powdering.
To
test finish adhesive, apply one coat to a small
area and let dry. Apply masking or cellophane
tape to the finish and pull up quickly. If the
finish comes off with the tape, you have poor
adhesion. This is especially important to do
when stripping the factory finish from new tile.